Undergraduate Teaching 2021-2022

Part I allowances

Part I allowances

Not logged in. More information may be available... Login via Raven / direct.

For lab experiments and projects, drawing and computing, students should make every attempt to complete the missed activity at a later date. Allowances of marks will not normally be granted for the Engineer in Society report or the Product Design project (in IA), or the Sustainable Engineering poster (in IB), unless illness is continuous from the date the task is set to the date on which submission is due. The credit available for IA activities can be found here and for IB activities here.

Part IA summary

Application deadlines: One week after the end of Michaelmas and Lent Full Terms for activities missed in those terms. All other applications must be received by one week after the last Part IA lecture in Easter Term.

Activity

Deadline extension

Marks

Dimensional analysis

Microprocessors

Not applicable

Yes, if lab cannot be rearranged

Drawing and computing

Yes

Not normally, and only if activity cannot be rearranged

Statics experiment, exposition

Yes

Yes, if activity cannot be rearranged

Lab experiments

Short labs - N/A
Long labs - Yes

Yes, if lab cannot be rearranged

Structural design project
Integrated electrical project

Yes

Yes, but not if the student can join another project group

Engineer in society report
Product design project

Yes

Yes, but only if illness is continuous from date when task was set to handing in date

Part IB summary

Application deadlines: One week after the end of Michaelmas and Lent Full Terms for activities missed in those terms. All other applications must be received by one week after the last Part IB lecture in Easter Term.

Activity

Deadline Extension

Marks

Lab experiments

Short labs - N/A
Long labs - Yes

Yes, if lab cannot be rearranged

Computing

Yes

Not normally, and only if activity cannot be rearranged

Integrated design project

Yes

Yes, but not if the student can join another project group

Sustainable engineering poster

Yes

Yes, but only if illness is continuous from date when task was set to handing in date

 

Last updated on 26/07/2019 13:09